A sample 40 MW grid-connected project with a full synthetic year of hourly telemetry. Move the design inputs and everything recalculates live: the compliance score against the upcoming regulatory framework, hourly matching, the flat IT load against the solar curve (with the night gap and the BESS it needs), the designed energy stack, matching and compliance costs, annual cost and ROI versus grid supply, financing structures and regulatory scenarios. Nothing is saved and no account is needed.
In the private workspace the same engines run on measured SCADA telemetry: metered PUE/WUE, curtailment ledger, CNMC filings, permitting lead time and the signed annual report.
Each area is scored 0-100 and weighted into the total. Open an area to see the variables behind its score.
Total = sum of (area score × weight). Areas are listed by the points you could still recover: Renewable energy & additionality is the largest single upside at +11.4 points.
Facility load
25.6MW
Annual electricity
224.4GWh
Hourly renewable matching
67.4%
Annual coverage 70.8%
Annual water
40,398m³
60% potable
Flexible response
20MW
78.1% of load
Waste heat available
24.3MW th
Low grade (<45 °C, heat pump required)
Jobs per MW
6.5
260 total
Grid import
72.4GWh/yr
The full product runs this on your real SCADA and PPA data: live DC panel, regulatory cockpit with compliance traffic lights, hourly matching vs. the executed ledger, curtailment engine and simulator on real flexibility assets, CNMC case tracking, sovereignty inventory, the bankability evidence pack and regulatory alerts from MITECO/MinTD. Request a guided demo.