BtMData — Energía y compliance para centros de datos
    Europe map

    Data centres in Belgium

    Map and list of the 36 data centres in Belgium: operator, capacity in MW, year and a linked source on every page.

    Sites

    36

    Cities

    0

    Substations ≥220 kV

    0

    Renewables ≥20 MW

    0

    Power and grid

    Clean electricity

    79.89%

    Renewables

    43.84%

    Carbon intensity

    109.3 gCO₂/kWh

    Annual demand

    80.28 TWh

    Sources: Ember – Yearly Electricity Data (2025)

    Grid congestion and connection pipeline in Belgium

    Grid availability decides where data centres get built: lower congestion and shorter queues attract more capacity.

    Grid congestion

    0.2%

    European average 1.5%

    Growth 2024-2030

    1.78x

    European average 1.8x

    Elia and Fluvius flagged a sharp rise in data centre connection applications in Flanders.

    Congestion measured as redispatch and countertrading volumes as a share of demand (2021-2023).

    Sites

    NameOperatorCityMWYearSource

    Data verified by BtMData. Unpublished values appear as “—”.

    Frequently asked questions

    How many data centres are there in Belgium?

    Our map lists 36 data centres in Belgium across 0 cities, verified one by one by BtMData. Each site has its own page with capacity, operator and location.

    How much renewable capacity is registered in Belgium?

    We track 0 geolocated renewable plants in Belgium, plus 0 substations of 220 kV or above.