    Investment Ready

    Lombardy Industrial Reconversion

    A unique opportunity to transform a historic textile manufacturing complex in Northern Italy into a high-security data center campus with phased capacity up to 100-200 MW.

    Aerial view of industrial complex
    Brownfield Development
    Varese, Lombardy, Italy • Near Lake Maggiore

    Project Specifications

    Phase 1 IT Load

    40-50 MW

    Total Built Area

    95,000 m²

    Ready-to-Build

    12-18 months

    Security Class

    Class 4 / Tier IV

    Grid Connection

    132 kV Dual

    Water Rights

    4M m³/year

    Investment Highlights

    40-50 MW IT

    Phase 1 Capacity

    Utilizing existing buildings 16-21

    100 MW IT

    Phase 2 Expansion

    Full campus transformation

    180-200 MW IT

    Phase 3 Potential

    New construction on paved areas

    €28-47M

    CAPEX Savings

    vs. equivalent greenfield development

    1.20x

    Target PUE

    Industry-leading efficiency

    Valley panorama with factory

    Strategic Cross-Border Location

    Located in Varese province, Lombardy, just 30 km from the Swiss border. The site offers unique cross-border fiber connectivity to Switzerland via existing infrastructure, enabling compliance with FINMA regulations for Swiss financial institutions.

    95,000 m² Built Area

    Industrial halls up to 13m height, ready for conversion to IT halls with overhead technical systems.

    4M m³/year Water Rights

    10 industrial wells and 10,000 m³/day treatment plant. Secured water access for advanced cooling.

    Energy Legacy

    Existing environmental permit (IPPC) for 70+ MWt thermal operations. Accelerated permitting path.

    Prime Access

    45 min from Milan Malpensa, 30 min from Swiss border. FiberCop, OpenFiber & Enel carriers within 300m.

    Exceptional Brownfield Advantages

    Time-to-Market

    Existing infrastructure saves 24-48 months vs. greenfield. Ready-to-build status achievable in 12-18 months.

    132 kV Substation

    Dual high-voltage connection already certified by TERNA. Eliminates €12-18M investment and years of permitting.

    380 kV Line at 500m

    High-capacity transmission line within 500 meters enables future expansion up to hyperscale capacity.

    Swiss Connectivity

    Swisscom fiber at the substation enables cross-border MMR for Swiss banks, insurers & hyperscalers.

    100 MWt Environmental License

    Existing IPPC permit authorizes 100 MWt thermal operations, dramatically accelerating permitting for data center use.

    Monetizable Infrastructure Assets

    Pre-existing assets that dramatically reduce CAPEX and accelerate deployment

    HV Substation (132 kV)

    Dual connection certified by TERNA, eliminates 24-36 months of permitting

    €10-15M

    Water Infrastructure

    10 wells, 4M m³/year authorized, treatment plant included

    €5-8M

    Energy Plant Legacy

    CTE foundations, steam network, and active IPPC permit

    €4-7M

    Urban Planning

    TPC zoning compatible with DC, heights up to 15m authorized

    €3-5M

    Cross-Border Fiber

    Swisscom presence enables Swiss financial market access

    €5-10M

    Electrical Infrastructure

    The 132 kV substation with dual TERNA connection represents one of the most valuable assets. This operational infrastructure eliminates years of grid access permitting and €12-18M in development costs.

    Electrical substation at sunset

    Electrical substation at sunset

    High-voltage infrastructure

    High-voltage infrastructure

    Industrial tower and equipment

    Industrial tower and equipment

    Site Gallery

    Aerial view of industrial complex

    Aerial view of industrial complex

    Valley panorama with factory

    Valley panorama with factory

    Factory main entrance

    Factory main entrance

    BtMData Services

    End-to-End Development Management

    BtMData provides comprehensive advisory services to transform this industrial asset into an investment-ready data center opportunity.

    • Technical due diligence & infrastructure assessment
    • TERNA capacity upgrade coordination (up to 120 MWe)
    • Environmental permitting optimization (IPPC)
    • Masterplan development for traditional & AI workloads
    • Investor matchmaking with hyperscalers & operators
    • Ready-to-build certification process

    Unique Investment Opportunity in Europe

    This energy brownfield combines HV electrical infrastructure, water rights, Swiss cross-border connectivity, and accelerated time-to-market.