    Bridge to Power

    Behind-the-meter SOFC generation

    Turn your site’s energy potential into a local generation project. Bridge power to develop or expand your data centre while grid access is resolved.

    Assess my project

    Illustrative software campus · Not an operating SOFC plant

    FROM FUEL TO LOCAL POWER

    Three layers. One integrated project.

    Fuel supply

    Natural gas or sustainable biomethane treated to manufacturer specifications. Flow, pressure and supply contract validated for your site.

    SOFC

    Solid oxide fuel cells: high-temperature electrochemical conversion for continuous generation. Net output, efficiency and degradation are agreed with the manufacturer.

    Electrical integration

    Transformers, protection, BESS, UPS and backup designed around the data centre load. SOFC alone does not replace the full resilience architecture.

    Local generation is not automatically authorised firm power: gas, emissions, connection, safety and permits are assessed for each site.

    From your asset to operation

    01

    Assess your asset

    Load, land, gas, connection and permits. We establish feasibility conditions before committing capacity or dates.

    02

    Design and contract

    Engineering and OEM/EPC quotes, fuel supply, power agreement and project financing structure.

    03

    Build and commission

    The manufacturer and a specialist EPC supply and integrate. Acceptance tests and warranties tailored to your facility.

    04

    Operate and document

    The asset-owning company contracts O&M and fuel. BtMData coordinates the project and GridPass organises contracts, milestones and evidence.

    Contracted power. Project-level capital.

    We structure the project so a special-purpose company, backed by infrastructure investors, owns the equipment. Your data centre contracts power: a capacity fee plus metered fuel at cost.

    The fee is negotiated around bridge duration, stack renewal, financing and potential reuse. Funding and accounting treatment are not guaranteed; they are agreed per project.

    Our software GridPass · MVP developed

    Energy and financial models, contracts, requirements and milestones in one dossier. GridPass Compliance structures traceable evidence; it does not replace official approval or accredited certification. SOFC integration and validation are developed with the manufacturer for each project.

    Explore GridPass

    Biomethane: lower fossil footprint, conditional value

    Certified sustainable biomethane can reduce lifecycle emissions and turn waste into value. The result depends on fuel origin and methane leakage. SOFC still emits biogenic CO₂; fossil-gas generation is not renewable.

    Removal credits require eligible capture and permanent storage, verification and no double counting. Only contracted net proceeds after all costs could lower the tariff. They are not guaranteed revenue and do not automatically offset the biomethane premium.

    Biomethane · European Commission

    Before committing your project

    Does your site have gas access?

    Let’s discuss location, electrical demand, supply and target timing. We start with a feasibility assessment.

    Request feasibility assessment

    Already have supply? The next step is managing it hour by hour with GridPass.

    Manage the power with GridPass