BtMData campus · conceptual visualisation
Step 2 · For site owners and data centre developers
BtMData Diligence
Before investing in your site, know what could hold back its power supply.
We review your documents, cross-check capacity and dates, and link risks to their evidence. You receive a committee memo with the conditions for moving forward and a phased energisation roadmap.
Evidence to decide. Conditions to move forward.
Cross-checked capacity
Which capacity is granted, which is available and what shortfall your first phase needs to cover.
Evidence-backed risks
A six-area matrix with severity, document quotes and page references, and actions still to resolve.
Committee memo
Executive summary, power alternatives, economic assumptions and conditions before investment.
Phased timeline
Documented dates against your target, permit expiries and connection and supply milestones to confirm.

BtMData campus · conceptual visualisation
Land is the starting point. Power decides.
The grid arrives late. The investment cannot wait.
If the final grid connection is years away, the question is how to start sooner. We evaluate bridge generation, gas, batteries and connection works to identify which alternative merits moving forward.
From assessment to asset developmentFrom your asset documents to a decision
1 · Gather the evidence
Site report, grid agreements, permits, technical studies and contracts in a private Data Room.
2 · Cross-check and review
AI proposes risks and facts with verified quotes. We review each finding and reconcile MW and dates with your power plan.
3 · Define the next steps
Committee memo with priority risks, outstanding conditions and a phased power proposal.
Beyond the power shortfall
Six areas that can shape your investment
We connect the power solution with permits, land, contracts and asset economics. Each area makes available evidence and outstanding checks explicit.
Power and connection
- Grid connection capacity and timing
- Power shortfall per phase
- Bridge generation: SOFC, engines and batteries
- Gas availability
Land and physical risk
- Access, area and land rights
- Flood and climate risks
- Geotechnics and topography
- Protected areas and neighbours
Permits and regulation
- Licence and authorisation status
- Zoning and planning
- Utility and grid-operator requirements
- Official gazettes and deadlines
Contracts
- Connection agreements and conditions
- Leases and easements
- Gas and power supply
- Construction and equipment contracts
Project economics
- Investment per phase and per MW
- Bridge power cost versus grid
- Gas and power price sensitivity
- Date of first revenue
Environmental, social and safety
- Bridge solution emissions
- Water and noise
- Community impact
- Construction and operating safety
A decision you can explain with evidence
Document traceability
PDF findings linked to a literal quote and page. MW and dates are cross-checked against your project inputs.
Reviewed risks
AI helps locate evidence; every addition to the matrix requires human review. Outstanding actions remain visible.
Committee memo
Executive summary, risks, sources and conditions for moving forward, with review coverage and explicit assumptions.
For whoever decides the investment
Land and industrial asset owners
Identify what your asset needs to become a viable data centre site.
Data centre developers
Compare power routes and dependencies before setting your first-phase timeline.
Investors and funds
Assess project evidence, risks and conditions before committing capital.
Three decisions on the ground
What we resolve before you invest
Every site is different. An engineer reviews grid, gas and phasing with you and tells you which alternative merits further study.

01 · The grid
How much firm power arrives, and when?
We cross-check connection agreements and their dates against your demand. We distinguish granted capacity from available power and flag what still needs confirmation.

02 · Bridge power
Which technology covers the gap?
We compare SOFC, engines and battery hybrids against load, gas and continuity requirements. We identify the questions to resolve with manufacturers and contractors.

03 · Phasing
What do you build first?
We define the conditions the first phase needs and how to align permits, bridge power and the final grid connection with asset development.
Your next decision starts with evidence: tell us where the site is, how much power you need and which documents you have.