    BtMData Diligence

    Before investing in your site, know what could hold back its power supply.

    We review your documents, cross-check capacity and dates, and link risks to their evidence. You receive a committee memo with the conditions for moving forward and a phased energisation roadmap.

    Evidence to decide. Conditions to move forward.

    Cross-checked capacity

    Which capacity is granted, which is available and what shortfall your first phase needs to cover.

    Evidence-backed risks

    A six-area matrix with severity, document quotes and page references, and actions still to resolve.

    Committee memo

    Executive summary, power alternatives, economic assumptions and conditions before investment.

    Phased timeline

    Documented dates against your target, permit expiries and connection and supply milestones to confirm.

    BtMData campus · conceptual visualisation

    Land is the starting point. Power decides.

    The grid arrives late. The investment cannot wait.

    If the final grid connection is years away, the question is how to start sooner. We evaluate bridge generation, gas, batteries and connection works to identify which alternative merits moving forward.

    From assessment to asset development

    From your asset documents to a decision

    1. 1 · Gather the evidence

      Site report, grid agreements, permits, technical studies and contracts in a private Data Room.

    2. 2 · Cross-check and review

      AI proposes risks and facts with verified quotes. We review each finding and reconcile MW and dates with your power plan.

    3. 3 · Define the next steps

      Committee memo with priority risks, outstanding conditions and a phased power proposal.

    Beyond the power shortfall

    Six areas that can shape your investment

    We connect the power solution with permits, land, contracts and asset economics. Each area makes available evidence and outstanding checks explicit.

    Power and connection

    • Grid connection capacity and timing
    • Power shortfall per phase
    • Bridge generation: SOFC, engines and batteries
    • Gas availability

    Land and physical risk

    • Access, area and land rights
    • Flood and climate risks
    • Geotechnics and topography
    • Protected areas and neighbours

    Permits and regulation

    • Licence and authorisation status
    • Zoning and planning
    • Utility and grid-operator requirements
    • Official gazettes and deadlines

    Contracts

    • Connection agreements and conditions
    • Leases and easements
    • Gas and power supply
    • Construction and equipment contracts

    Project economics

    • Investment per phase and per MW
    • Bridge power cost versus grid
    • Gas and power price sensitivity
    • Date of first revenue

    Environmental, social and safety

    • Bridge solution emissions
    • Water and noise
    • Community impact
    • Construction and operating safety

    A decision you can explain with evidence

    Document traceability

    PDF findings linked to a literal quote and page. MW and dates are cross-checked against your project inputs.

    Reviewed risks

    AI helps locate evidence; every addition to the matrix requires human review. Outstanding actions remain visible.

    Committee memo

    Executive summary, risks, sources and conditions for moving forward, with review coverage and explicit assumptions.

    For whoever decides the investment

    Land and industrial asset owners

    Identify what your asset needs to become a viable data centre site.

    Data centre developers

    Compare power routes and dependencies before setting your first-phase timeline.

    Investors and funds

    Assess project evidence, risks and conditions before committing capital.

    Three decisions on the ground

    What we resolve before you invest

    Every site is different. An engineer reviews grid, gas and phasing with you and tells you which alternative merits further study.

    01 · The grid

    How much firm power arrives, and when?

    We cross-check connection agreements and their dates against your demand. We distinguish granted capacity from available power and flag what still needs confirmation.

    02 · Bridge power

    Which technology covers the gap?

    We compare SOFC, engines and battery hybrids against load, gas and continuity requirements. We identify the questions to resolve with manufacturers and contractors.

    03 · Phasing

    What do you build first?

    We define the conditions the first phase needs and how to align permits, bridge power and the final grid connection with asset development.

    Your next decision starts with evidence: tell us where the site is, how much power you need and which documents you have.