    Châtelineau

    Google Datacenter

    Verified profile of Google Datacenter (Google), a data centre in Châtelineau, Belgium: mapped location, grid context and nearby renewables.

    MW

    —

    Substations <25 km

    —

    Renewables <25 km

    —

    Renewable MW nearby

    —

    Could your asset host a data centre?

    Indicative grid, energy and competition screening. Two queries per account; not a grid connection study.

    Châtelineau, Belgium
    Assess my asset

    Published MW and IT load have different scopes. A nearby substation confirms neither connection nor available capacity; check status and figures against their sources.

    Technical data

    Published capacity

    Not published

    Year

    Not published

    Operator

    Google

    Grid connection

    No mapped substation within 25 km

    BtMData grid mapping

    Fibre latency (physical estimate)

    ~3.2 ms RTT → Amsterdam (216 km)

    Computed: geodesic distance / 200 km·ms⁻¹

    Current ambient temperature

    …

    Live weather measurement

    Latency is a physical lower-bound estimate, not a real network measurement.

    Connectivity: network and transport

    Nearby infrastructure from OpenStreetMap, queried live.

    Loading…

    Data centre record

    Operator / developerGoogle
    Published capacity—
    CityChâtelineau
    CountryBelgium
    Address—
    Coordinates50.43765, 4.57429
    Year—
    StatusUnder construction
    Phase—
    Expected year—
    IT load—
    Capacity noteFarciennes/Châtelineau project: interview with Google site lead describes first building approaching completion and second under construction. Source: https://www.sudinfo.be/id1196095/article/2026-09-20/permis-refuse-craintes-des-riverains-impact-sur-lenvironnement-un-des-boss-de (published 2026-09-20; reviewed 2026-10-16). Unsupported operational status and opening year 2026 removed. Capacity and actual commissioning date unverified.
    PUE—
    Energy type—
    Renewable energy—
    Energy note—
    Certifications—
    Certification note—
    Record last reviewed16/10/2026