BtMData — Energía y compliance para centros de datos
    Besançon

    nLighten

    Verified profile of nLighten (nLighten), a data centre in Besançon, France since 2012: mapped location, grid context and nearby renewables.

    MW

    —

    Substations <25 km

    —

    Renewables <25 km

    —

    Renewable MW nearby

    —

    Could your asset host a data centre?

    Indicative grid, energy and competition screening. Two queries per account; not a grid connection study.

    Besançon, France
    Assess my asset

    Published MW and IT load have different scopes. A nearby substation confirms neither connection nor available capacity; check status and figures against their sources.

    Technical data

    Published capacity

    Not published

    Year

    2012

    Operator

    nLighten

    Grid connection

    No mapped substation within 25 km

    BtMData grid mapping

    Fibre latency (physical estimate)

    ~4.2 ms RTT → Milan (315 km)

    Computed: geodesic distance / 200 km·ms⁻¹

    Current ambient temperature

    …

    Live weather measurement

    Latency is a physical lower-bound estimate, not a real network measurement.

    Connectivity: network and transport

    Nearby infrastructure from OpenStreetMap, queried live.

    Loading…

    Data centre record

    Operator / developernLighten
    Published capacity—
    CityBesançon
    CountryFrance
    Address2, rue Albert Einstein, 25000
    Coordinates47.22625, 5.97408
    Year2012
    StatusOperational
    Phase—
    Expected year—
    IT load—
    Capacity note—
    PUE—
    Energy type—
    Renewable energy—
    Energy note—
    Certifications—
    Certification note—
    Record last reviewed14/09/2026

    We only publish verifiable data. Anything the operator does not publish shows as “—”; it is never estimated.

    Links for nLighten

    Assess an asset with GridPass