    Map and list of the 675 data centres in Germany: operator, capacity in MW, year and a linked source on every page.

    Sites

    675

    Cities

    0

    Substations ≥220 kV

    0

    Renewables ≥20 MW

    0

    Power and grid

    Clean electricity

    59.1%

    Renewables

    59.1%

    Carbon intensity

    329.65 gCO₂/kWh

    Annual demand

    520.01 TWh

    Sources: Ember – Yearly Electricity Data (2025)

    Grid congestion and connection pipeline in Germany

    Grid availability decides where data centres get built: lower congestion and shorter queues attract more capacity.

    Grid congestion

    4.6%

    European average 1.5%

    Years in connection queue

    6.5

    European average ~4 years

    Growth 2024-2030

    1.6x

    European average 1.8x

    Frankfurt grid operators have effectively halted new data centre connections until at least 2030.

    Congestion measured as redispatch and countertrading volumes as a share of demand (2021-2023).

    Sites

    NameOperatorCityMWYearSource

    Data verified by BtMData. Unpublished values appear as “—”.

    Frequently asked questions

    How many data centres are there in Germany?

    Our map lists 675 data centres in Germany across 0 cities, verified one by one by BtMData. Each site has its own page with capacity, operator and location.

    How much renewable capacity is registered in Germany?

    We track 0 geolocated renewable plants in Germany, plus 0 substations of 220 kV or above.