BtMData — Energía y compliance para centros de datos
    Stuttgart

    Höchstleistungsrechenzentrum der Universität Stuttgart

    Verified profile of Höchstleistungsrechenzentrum der Universität Stuttgart, a data centre in Stuttgart, Germany since 1995: exact location, grid connection…

    MW

    —

    Substations <25 km

    —

    Renewables <25 km

    —

    Renewable MW nearby

    —

    Technical data

    Published capacity

    Not published

    Year

    1995

    Operator

    Not published

    Grid connection

    No mapped substation within 25 km

    BtMData grid mapping

    Fibre latency (physical estimate)

    ~2.6 ms RTT → Frankfurt (155 km)

    Computed: geodesic distance / 200 km·ms⁻¹

    Current ambient temperature

    …

    Live weather measurement

    Latency is a physical lower-bound estimate, not a real network measurement.

    Connectivity: network and transport

    Nearby infrastructure from OpenStreetMap, queried live.

    Loading…

    Data centre record

    Operator / developer—
    Published capacity—
    CityStuttgart
    CountryGermany
    AddressNobelstraße 19, 70569
    Coordinates48.73949, 9.09732
    Year1995
    StatusOperational
    Phase—
    Expected year—
    IT load—
    Capacity note—
    PUE—
    Energy type—
    Renewable energy—
    Energy note—
    Certifications—
    Certification note—
    Verified—

    We only publish verifiable data. Anything the operator does not publish shows as “—”; it is never estimated.

    Links for Höchstleistungsrechenzentrum der Universität Stuttgart

    Assess an asset with GridPass