BtMData β€” EnergΓ­a y compliance para centros de datos
    Ellhofen

    Rechenzentrum Ellhofen

    Verified profile of Rechenzentrum Ellhofen (Stack IT), a data centre in Ellhofen, Germany: mapped location, grid context and nearby renewables.

    MW

    β€”

    Substations <25 km

    β€”

    Renewables <25 km

    β€”

    Renewable MW nearby

    β€”

    Could your asset host a data centre?

    Indicative grid, energy and competition screening. Two queries per account; not a grid connection study.

    Ellhofen, Germany
    Assess my asset

    Published MW and IT load have different scopes. A nearby substation confirms neither connection nor available capacity; check status and figures against their sources.

    Technical data

    Published capacity

    Not published

    Year

    Not published

    Operator

    Stack IT

    Grid connection

    No mapped substation within 25 km

    BtMData grid mapping

    Fibre latency (physical estimate)

    ~2.2 ms RTT β†’ Frankfurt (116 km)

    Computed: geodesic distance / 200 km·ms⁻¹

    Current ambient temperature

    …

    Live weather measurement

    Latency is a physical lower-bound estimate, not a real network measurement.

    Connectivity: network and transport

    Nearby infrastructure from OpenStreetMap, queried live.

    Loading…

    Data centre record

    Operator / developerStack IT
    Published capacityβ€”
    CityEllhofen
    CountryGermany
    AddressAm Autobahnkreuz 14, 74248
    Coordinates49.14585, 9.30803
    Yearβ€”
    StatusOperational
    Phaseβ€”
    Expected yearβ€”
    IT loadβ€”
    Capacity noteβ€”
    PUEβ€”
    Energy typeβ€”
    Renewable energyβ€”
    Energy noteβ€”
    Certificationsβ€”
    Certification noteβ€”
    Record last reviewed14/09/2026

    We only publish verifiable data. Anything the operator does not publish shows as β€œβ€”β€; it is never estimated.

    Links for Rechenzentrum Ellhofen