BtMData — Energía y compliance para centros de datos
    Emsdetten

    TKRZ Business

    Verified profile of TKRZ Business (TKRZ Business), a data centre in Emsdetten, Germany: mapped location, grid context and nearby renewables.

    MW

    —

    Substations <25 km

    —

    Renewables <25 km

    —

    Renewable MW nearby

    —

    Could your asset host a data centre?

    Indicative grid, energy and competition screening. Two queries per account; not a grid connection study.

    Emsdetten, Germany
    Assess my asset

    Published MW and IT load have different scopes. A nearby substation confirms neither connection nor available capacity; check status and figures against their sources.

    Technical data

    Published capacity

    Not published

    Year

    Not published

    Operator

    TKRZ Business

    Grid connection

    No mapped substation within 25 km

    BtMData grid mapping

    Fibre latency (physical estimate)

    ~2.8 ms RTT → Amsterdam (182 km)

    Computed: geodesic distance / 200 km·ms⁻¹

    Current ambient temperature

    …

    Live weather measurement

    Latency is a physical lower-bound estimate, not a real network measurement.

    Connectivity: network and transport

    Nearby infrastructure from OpenStreetMap, queried live.

    Loading…

    Data centre record

    Operator / developerTKRZ Business
    Published capacity—
    CityEmsdetten
    CountryGermany
    AddressHollefeldstraße 5-7, 48282
    Coordinates52.15734, 7.55537
    Year—
    StatusOperational
    Phase—
    Expected year—
    IT load—
    Capacity note—
    PUE—
    Energy type—
    Renewable energy—
    Energy note—
    Certifications—
    Certification note—
    Record last reviewed14/09/2026

    We only publish verifiable data. Anything the operator does not publish shows as “—”; it is never estimated.