    Data centres in Italy

    Map and list of the 317 data centres in Italy: operator, capacity in MW, year and a linked source on every page.

    Sites

    317

    Cities

    0

    Substations ≥220 kV

    0

    Renewables ≥20 MW

    0

    Power and grid

    Clean electricity

    48.74%

    Renewables

    48.74%

    Carbon intensity

    284.63 gCO₂/kWh

    Annual demand

    311.83 TWh

    Sources: Ember – Yearly Electricity Data (2025)

    Grid congestion and connection pipeline in Italy

    Grid availability decides where data centres get built: lower congestion and shorter queues attract more capacity.

    Grid congestion

    1.1%

    European average 1.5%

    Years in connection queue

    3

    European average ~4 years

    Growth 2024-2030

    1.95x

    European average 1.8x

    Capacity in queue

    30 GW

    Requests filed with the TSO

    Terna reported ~30 GW of data centre grid connection requests in the queue at end-2024, ~80% filed in the last 12 months.

    Congestion measured as redispatch and countertrading volumes as a share of demand (2021-2023).

    Sites

    NameOperatorCityMWYearSource

    Data verified by BtMData. Unpublished values appear as “—”.

    Frequently asked questions

    How many data centres are there in Italy?

    Our map lists 317 data centres in Italy across 0 cities, verified one by one by BtMData. Each site has its own page with capacity, operator and location.

    How much renewable capacity is registered in Italy?

    We track 0 geolocated renewable plants in Italy, plus 0 substations of 220 kV or above.