Colleferro Ai Data Center
Verified profile of Colleferro Ai Data Center (Cobra Green Hyperscale), a data centre in Segni, Italy: mapped location, grid context and nearby renewables.
MW
β
Substations <25 km
β
Renewables <25 km
β
Renewable MW nearby
β
Could your asset host a data centre?
Indicative grid, energy and competition screening. Two queries per account; not a grid connection study.
Published MW and IT load have different scopes. A nearby substation confirms neither connection nor available capacity; check status and figures against their sources.
Technical data
Published capacity
Not published
Year
Not published
Operator
Cobra Green Hyperscale
Grid connection
No mapped substation within 25 km
BtMData grid mapping
Fibre latency (physical estimate)
~6.2 ms RTT β Milan (521 km)
Computed: geodesic distance / 200 kmΒ·msβ»ΒΉ
Current ambient temperature
β¦
Live weather measurement
Latency is a physical lower-bound estimate, not a real network measurement.
Connectivity: network and transport
Nearby infrastructure from OpenStreetMap, queried live.
Loadingβ¦
Data centre record
| Operator / developer | Cobra Green Hyperscale |
|---|---|
| Published capacity | β |
| City | Segni |
| Country | Italy |
| Address | Via Casilina, KM 52,200, 00037 |
| Coordinates | 41.69144, 13.02318 |
| Year | β |
| Status | Operational |
| Phase | β |
| Expected year | β |
| IT load | β |
| Capacity note | β |
| PUE | β |
| Energy type | β |
| Renewable energy | β |
| Energy note | β |
| Certifications | β |
| Certification note | β |
| Record last reviewed | 14/09/2026 |
We only publish verifiable data. Anything the operator does not publish shows as βββ; it is never estimated.
