BtMData β€” EnergΓ­a y compliance para centros de datos
    Lamezia Terme

    Tlcweb Data Center

    Verified profile of Tlcweb Data Center (Intendo S.r.l.), a data centre in Lamezia Terme, Italy: mapped location, grid context and nearby renewables.

    MW

    β€”

    Substations <25 km

    β€”

    Renewables <25 km

    β€”

    Renewable MW nearby

    β€”

    Could your asset host a data centre?

    Indicative grid, energy and competition screening. Two queries per account; not a grid connection study.

    Lamezia Terme, Italy
    Assess my asset

    Published MW and IT load have different scopes. A nearby substation confirms neither connection nor available capacity; check status and figures against their sources.

    Technical data

    Published capacity

    Not published

    Year

    Not published

    Operator

    Intendo S.r.l.

    Grid connection

    No mapped substation within 25 km

    BtMData grid mapping

    Fibre latency (physical estimate)

    ~10.3 ms RTT β†’ Milan (929 km)

    Computed: geodesic distance / 200 km·ms⁻¹

    Current ambient temperature

    …

    Live weather measurement

    Latency is a physical lower-bound estimate, not a real network measurement.

    Connectivity: network and transport

    Nearby infrastructure from OpenStreetMap, queried live.

    Loading…

    Data centre record

    Operator / developerIntendo S.r.l.
    Published capacityβ€”
    CityLamezia Terme
    CountryItaly
    AddressVia Coschi, 11, 88048
    Coordinates38.95387, 16.28351
    Yearβ€”
    StatusOperational
    Phaseβ€”
    Expected yearβ€”
    IT loadβ€”
    Capacity noteβ€”
    PUEβ€”
    Energy typeβ€”
    Renewable energyβ€”
    Energy noteβ€”
    Certificationsβ€”
    Certification noteβ€”
    Record last reviewed14/09/2026

    We only publish verifiable data. Anything the operator does not publish shows as β€œβ€”β€; it is never estimated.

    Links for Tlcweb Data Center

    No source link is recorded for this site.Open in maps
    Assess an asset with GridPass