BtMData β€” EnergΓ­a y compliance para centros de datos
    Amsterdam-West

    Gyro Center

    Verified profile of Gyro Center (Gyro Center), a data centre in Amsterdam-West, Netherlands since 2026: mapped location, grid context and nearby renewables.

    MW

    β€”

    Substations <25 km

    β€”

    Renewables <25 km

    β€”

    Renewable MW nearby

    β€”

    Could your asset host a data centre?

    Indicative grid, energy and competition screening. Two queries per account; not a grid connection study.

    Amsterdam-West, Netherlands
    Assess my asset

    Published MW and IT load have different scopes. A nearby substation confirms neither connection nor available capacity; check status and figures against their sources.

    Technical data

    Published capacity

    Not published

    Year

    2026

    Operator

    Gyro Center

    Grid connection

    No mapped substation within 25 km

    BtMData grid mapping

    Fibre latency (physical estimate)

    ~1.1 ms RTT β†’ Amsterdam (6 km)

    Computed: geodesic distance / 200 km·ms⁻¹

    Current ambient temperature

    …

    Live weather measurement

    Latency is a physical lower-bound estimate, not a real network measurement.

    Connectivity: network and transport

    Nearby infrastructure from OpenStreetMap, queried live.

    Loading…

    Data centre record

    Operator / developerGyro Center
    Published capacityβ€”
    CityAmsterdam-West
    CountryNetherlands
    AddressGyroscoopweg 134-140, 1042 AZ
    Coordinates52.40064, 4.84317
    Year2026
    StatusOperational
    Phaseβ€”
    Expected yearβ€”
    IT loadβ€”
    Capacity noteβ€”
    PUEβ€”
    Energy typeβ€”
    Renewable energyβ€”
    Energy noteβ€”
    Certificationsβ€”
    Certification noteβ€”
    Record last reviewed14/09/2026

    We only publish verifiable data. Anything the operator does not publish shows as β€œβ€”β€; it is never estimated.

    Links for Gyro Center

    No source link is recorded for this site.Open in maps
    Assess an asset with GridPass