BtMData — Energía y compliance para centros de datos
    Europe map

    Data centres in Norway

    Map and list of the 30 data centres in Norway: operator, capacity in MW, year and a linked source on every page.

    Sites

    30

    Cities

    0

    Substations ≥220 kV

    0

    Renewables ≥20 MW

    0

    Power and grid

    Clean electricity

    98.99%

    Renewables

    98.99%

    Carbon intensity

    28.1 gCO₂/kWh

    Annual demand

    137.76 TWh

    Sources: Ember – Yearly Electricity Data (2025)

    Grid congestion and connection pipeline in Norway

    Grid availability decides where data centres get built: lower congestion and shorter queues attract more capacity.

    Grid congestion

    0.8%

    European average 1.5%

    Years in connection queue

    2

    European average ~4 years

    Growth 2024-2030

    2.75x

    European average 1.8x

    Shortest connection waits in Europe; Statnett plans for a tripling of data centre demand by 2030.

    Congestion measured as redispatch and countertrading volumes as a share of demand (2021-2023).

    Sites

    NameOperatorCityMWYearSource

    Data verified by BtMData. Unpublished values appear as “—”.

    Frequently asked questions

    How many data centres are there in Norway?

    Our map lists 30 data centres in Norway across 0 cities, verified one by one by BtMData. Each site has its own page with capacity, operator and location.

    How much renewable capacity is registered in Norway?

    We track 0 geolocated renewable plants in Norway, plus 0 substations of 220 kV or above.