BtMData — Energía y compliance para centros de datos
    San Agustín del Guadalix

    Data 4 MAD2 Campus

    Verified profile of Data 4 MAD2 Campus (Data4), a 50 MW data centre in San Agustín del Guadalix, Spain: mapped location, grid context and nearby renewables.

    MW

    50

    Substations <25 km

    —

    Renewables <25 km

    —

    Renewable MW nearby

    —

    Could your asset host a data centre?

    Indicative grid, energy and competition screening. Two queries per account; not a grid connection study.

    San Agustín del Guadalix, Spain
    Assess my asset

    Published MW and IT load have different scopes. A nearby substation confirms neither connection nor available capacity; check status and figures against their sources.

    Technical data

    Published capacity

    50 MW

    Year

    Not published

    Operator

    Data4

    Grid connection

    No mapped substation within 25 km

    BtMData grid mapping

    Fibre latency (physical estimate)

    ~1.3 ms RTT → Madrid (29 km)

    Computed: geodesic distance / 200 km·ms⁻¹

    Current ambient temperature

    …

    Live weather measurement

    Latency is a physical lower-bound estimate, not a real network measurement.

    Connectivity: network and transport

    Nearby infrastructure from OpenStreetMap, queried live.

    Loading…

    Data centre record

    Operator / developerData4
    Published capacity50 MW
    CitySan Agustín del Guadalix
    CountrySpain
    AddressCalle Begoña Villacís
    Coordinates40.67065, -3.60783
    Year—
    StatusUnder construction
    PhaseMAD02 San Agustín del Guadalix campus. Prior construction status based on press reporting is retained, but not confirmed by the official facility page. Construction start and commissioning year not confirmed; 50 MW does not establish opening of all capacity.
    Expected year—
    IT load—
    Capacity noteDATA4 lists 50 MW for MAD01 and 50 MW for MAD02, describing 100 MW of electrical reserves overall. IT load and energized capacity per building are not specified. Page has no visible publication date; reviewed 2026-10-25. Do not add the 100 MW aggregate again to the two 50 MW campus figures.
    PUE—
    Energy type—
    Renewable energy—
    Energy note—
    Certifications—
    Certification note—
    Record last reviewed25/10/2026

    We only publish verifiable data. Anything the operator does not publish shows as “—”; it is never estimated.

    Links for Data 4 MAD2 Campus

    Assess an asset with GridPass