DayOne / IGNIS - campus IA Aragón Escatrón
Verified profile of DayOne / IGNIS - campus IA Aragón Escatrón (DayOne / IGNIS – campus IA Aragón), a data centre in Escatrón, Spain: mapped location, grid…
MW
—
Substations <25 km
—
Renewables <25 km
—
Renewable MW nearby
—
Could your asset host a data centre?
Indicative grid, energy and competition screening. Two queries per account; not a grid connection study.
Published MW and IT load have different scopes. A nearby substation confirms neither connection nor available capacity; check status and figures against their sources.
Technical data
Published capacity
Not published
Year
Not published
Operator
DayOne / IGNIS – campus IA Aragón
Grid connection
No mapped substation within 25 km
BtMData grid mapping
Fibre latency (physical estimate)
~4 ms RTT → Madrid (300 km)
Computed: geodesic distance / 200 km·ms⁻¹
Current ambient temperature
…
Live weather measurement
Latency is a physical lower-bound estimate, not a real network measurement.
Connectivity: network and transport
Nearby infrastructure from OpenStreetMap, queried live.
Loading…
Data centre record
| Operator / developer | DayOne / IGNIS – campus IA Aragón |
|---|---|
| Published capacity | — |
| City | Escatrón |
| Country | Spain |
| Address | — |
| Coordinates | 41.28707, -0.32495 |
| Year | — |
| Status | Announced |
| Phase | Project recorded as announced in a secondary source; construction, opening and commissioning schedule unconfirmed by a primary source located. Operational status is not validated. Reviewed 2026-10-25. |
| Expected year | — |
| IT load | — |
| Capacity note | Reviewed 2026-10-25. Removed 300 MW reported by secondary press (DCD, 2026-06-10): no original operator confirmation located for this campus. Official indexes reviewed: https://dayonedc.com/news and https://ignis.es/actualidad-y-prensa/ . Capacity, IT/supply scope, developer commitment and operating capacity unconfirmed. Escatrón renewable generation does not establish data-centre capacity. |
| PUE | — |
| Energy type | — |
| Renewable energy | — |
| Energy note | — |
| Certifications | — |
| Certification note | — |
| Record last reviewed | 25/10/2026 |
We only publish verifiable data. Anything the operator does not publish shows as “—”; it is never estimated.