BtMData — Energía y compliance para centros de datos
    Escatrón

    DayOne / IGNIS - campus IA Aragón Escatrón

    Verified profile of DayOne / IGNIS - campus IA Aragón Escatrón (DayOne / IGNIS – campus IA Aragón), a data centre in Escatrón, Spain: mapped location, grid…

    MW

    —

    Substations <25 km

    —

    Renewables <25 km

    —

    Renewable MW nearby

    —

    Could your asset host a data centre?

    Indicative grid, energy and competition screening. Two queries per account; not a grid connection study.

    Escatrón, Spain
    Assess my asset

    Published MW and IT load have different scopes. A nearby substation confirms neither connection nor available capacity; check status and figures against their sources.

    Technical data

    Published capacity

    Not published

    Year

    Not published

    Operator

    DayOne / IGNIS – campus IA Aragón

    Grid connection

    No mapped substation within 25 km

    BtMData grid mapping

    Fibre latency (physical estimate)

    ~4 ms RTT → Madrid (300 km)

    Computed: geodesic distance / 200 km·ms⁻¹

    Current ambient temperature

    …

    Live weather measurement

    Latency is a physical lower-bound estimate, not a real network measurement.

    Connectivity: network and transport

    Nearby infrastructure from OpenStreetMap, queried live.

    Loading…

    Data centre record

    Operator / developerDayOne / IGNIS – campus IA Aragón
    Published capacity—
    CityEscatrón
    CountrySpain
    Address—
    Coordinates41.28707, -0.32495
    Year—
    StatusAnnounced
    PhaseProject recorded as announced in a secondary source; construction, opening and commissioning schedule unconfirmed by a primary source located. Operational status is not validated. Reviewed 2026-10-25.
    Expected year—
    IT load—
    Capacity noteReviewed 2026-10-25. Removed 300 MW reported by secondary press (DCD, 2026-06-10): no original operator confirmation located for this campus. Official indexes reviewed: https://dayonedc.com/news and https://ignis.es/actualidad-y-prensa/ . Capacity, IT/supply scope, developer commitment and operating capacity unconfirmed. Escatrón renewable generation does not establish data-centre capacity.
    PUE—
    Energy type—
    Renewable energy—
    Energy note—
    Certifications—
    Certification note—
    Record last reviewed25/10/2026

    We only publish verifiable data. Anything the operator does not publish shows as “—”; it is never estimated.

    Links for DayOne / IGNIS - campus IA Aragón Escatrón

    No source link is recorded for this site.Open in maps
    Assess an asset with GridPass