Echelon Iberdrola Digital Infra Madrid Sur / Aceca-Toledo
Verified profile of Echelon Iberdrola Digital Infra Madrid Sur / Aceca-Toledo (Echelon Iberdrola Digital Infra), a 144 MW data centre in Madrid Sur /…
MW
144
Substations <25 km
—
Renewables <25 km
—
Renewable MW nearby
—
Could your asset host a data centre?
Indicative grid, energy and competition screening. Two queries per account; not a grid connection study.
Published MW and IT load have different scopes. A nearby substation confirms neither connection nor available capacity; check status and figures against their sources.
Technical data
Published capacity
144 MW
Year
Not published
Operator
Echelon Iberdrola Digital Infra
Grid connection
No mapped substation within 25 km
BtMData grid mapping
Fibre latency (physical estimate)
~1.7 ms RTT → Madrid (67 km)
Computed: geodesic distance / 200 km·ms⁻¹
Current ambient temperature
…
Live weather measurement
Latency is a physical lower-bound estimate, not a real network measurement.
Connectivity: network and transport
Nearby infrastructure from OpenStreetMap, queried live.
Loading…
Data centre record
| Operator / developer | Echelon Iberdrola Digital Infra |
|---|---|
| Published capacity | 144 MW |
| City | Madrid Sur / Aceca-Toledo |
| Country | Spain |
| Address | — |
| Coordinates | 39.86000, -4.02000 |
| Year | — |
| Status | Announced |
| Phase | — |
| Expected year | — |
| IT load | — |
| Capacity note | Power not verified against a primary source. |
| PUE | — |
| Energy type | — |
| Renewable energy | — |
| Energy note | — |
| Certifications | — |
| Certification note | — |
| Record last reviewed | — |
We only publish verifiable data. Anything the operator does not publish shows as “—”; it is never estimated.