Global Switch Madrid
Verified profile of Global Switch Madrid (Global Switch), a data centre in Madrid, Spain: mapped location, grid context and nearby renewables.
MW
—
Substations <25 km
—
Renewables <25 km
—
Renewable MW nearby
—
Could your asset host a data centre?
Indicative grid, energy and competition screening. Two queries per account; not a grid connection study.
Published MW and IT load have different scopes. A nearby substation confirms neither connection nor available capacity; check status and figures against their sources.
Technical data
Published capacity
Not published
Year
Not published
Operator
Global Switch
Grid connection
No mapped substation within 25 km
BtMData grid mapping
Fibre latency (physical estimate)
~1.1 ms RTT → Madrid (12 km)
Computed: geodesic distance / 200 km·ms⁻¹
Current ambient temperature
…
Live weather measurement
Latency is a physical lower-bound estimate, not a real network measurement.
Connectivity: network and transport
Nearby infrastructure from OpenStreetMap, queried live.
Loading…
Data centre record
| Operator / developer | Global Switch |
|---|---|
| Published capacity | — |
| City | Madrid |
| Country | Spain |
| Address | — |
| Coordinates | 40.44800, -3.57410 |
| Year | — |
| Status | Operational |
| Phase | Generic Madrid entry: commissioning year not confirmed. Official page mentions advanced expansion plans; directory alone does not confirm Madrid 2 opening. |
| Expected year | — |
| IT load | — |
| Capacity note | Previous unsupported 18 MW removed from this generic record. Official directory lists Madrid 1: 14 MW; Madrid 2: 56 MW (https://www.globalswitch.com/data-centres/), without explicit IT/supply basis or energized-capacity split. 70 MW operational capacity is not assigned to the generic marker, nor is it automatically mapped to one building. Sources have no visible publication date; reviewed 2026-10-25. |
| PUE | — |
| Energy type | — |
| Renewable energy | — |
| Energy note | — |
| Certifications | — |
| Certification note | — |
| Record last reviewed | 25/10/2026 |
We only publish verifiable data. Anything the operator does not publish shows as “—”; it is never estimated.