Grupo Fotones Casiopeia Campus
Verified profile of Grupo Fotones Casiopeia Campus (Grupo Fotones), a 140 MW data centre in Espinardo, Spain: mapped location, grid context and nearby…
MW
140
Substations <25 km
—
Renewables <25 km
—
Renewable MW nearby
—
Could your asset host a data centre?
Indicative grid, energy and competition screening. Two queries per account; not a grid connection study.
Published MW and IT load have different scopes. A nearby substation confirms neither connection nor available capacity; check status and figures against their sources.
Technical data
Published capacity
140 MW
Year
Not published
Operator
Grupo Fotones
Grid connection
No mapped substation within 25 km
BtMData grid mapping
Fibre latency (physical estimate)
~4.5 ms RTT → Madrid (355 km)
Computed: geodesic distance / 200 km·ms⁻¹
Current ambient temperature
…
Live weather measurement
Latency is a physical lower-bound estimate, not a real network measurement.
Connectivity: network and transport
Nearby infrastructure from OpenStreetMap, queried live.
Loading…
Data centre record
| Operator / developer | Grupo Fotones |
|---|---|
| Published capacity | 140 MW |
| City | Espinardo |
| Country | Spain |
| Address | — |
| Coordinates | 37.93475, -1.11310 |
| Year | — |
| Status | Announced |
| Phase | Project promoted by Grupo Fotones; final operator, commissioning date and precise Espinardo location are unconfirmed in the primary source reviewed. This is not an operational facility. |
| Expected year | — |
| IT load | — |
| Capacity note | Initial 78 MW capacity, expandable to 140 MW, announced by Grupo Fotones for Casiopea in Murcia; 140 MW is maximum planned potential, not operating capacity. The website claims 78 MW granted power, with no grid-operator document found to independently verify it. IT/utility basis is not explicit. Page has no visible publication date; reviewed 25 October 2026. |
| PUE | — |
| Energy type | — |
| Renewable energy | — |
| Energy note | Approximate location at the city centre; exact coordinates not published. |
| Certifications | — |
| Certification note | — |
| Record last reviewed | 25/10/2026 |
We only publish verifiable data. Anything the operator does not publish shows as “—”; it is never estimated.