BtMData — Energía y compliance para centros de datos
    Espinardo

    Grupo Fotones Casiopeia Campus

    Verified profile of Grupo Fotones Casiopeia Campus (Grupo Fotones), a 140 MW data centre in Espinardo, Spain: mapped location, grid context and nearby…

    MW

    140

    Substations <25 km

    —

    Renewables <25 km

    —

    Renewable MW nearby

    —

    Could your asset host a data centre?

    Indicative grid, energy and competition screening. Two queries per account; not a grid connection study.

    Espinardo, Spain
    Assess my asset

    Published MW and IT load have different scopes. A nearby substation confirms neither connection nor available capacity; check status and figures against their sources.

    Technical data

    Published capacity

    140 MW

    Year

    Not published

    Operator

    Grupo Fotones

    Grid connection

    No mapped substation within 25 km

    BtMData grid mapping

    Fibre latency (physical estimate)

    ~4.5 ms RTT → Madrid (355 km)

    Computed: geodesic distance / 200 km·ms⁻¹

    Current ambient temperature

    …

    Live weather measurement

    Latency is a physical lower-bound estimate, not a real network measurement.

    Connectivity: network and transport

    Nearby infrastructure from OpenStreetMap, queried live.

    Loading…

    Data centre record

    Operator / developerGrupo Fotones
    Published capacity140 MW
    CityEspinardo
    CountrySpain
    Address—
    Coordinates37.93475, -1.11310
    Year—
    StatusAnnounced
    PhaseProject promoted by Grupo Fotones; final operator, commissioning date and precise Espinardo location are unconfirmed in the primary source reviewed. This is not an operational facility.
    Expected year—
    IT load—
    Capacity noteInitial 78 MW capacity, expandable to 140 MW, announced by Grupo Fotones for Casiopea in Murcia; 140 MW is maximum planned potential, not operating capacity. The website claims 78 MW granted power, with no grid-operator document found to independently verify it. IT/utility basis is not explicit. Page has no visible publication date; reviewed 25 October 2026.
    PUE—
    Energy type—
    Renewable energy—
    Energy noteApproximate location at the city centre; exact coordinates not published.
    Certifications—
    Certification note—
    Record last reviewed25/10/2026

    We only publish verifiable data. Anything the operator does not publish shows as “—”; it is never estimated.

    Links for Grupo Fotones Casiopeia Campus

    No source link is recorded for this site.Open in maps
    Assess an asset with GridPass