    Iron Mountain Madrid Campus MAD-1

    Verified profile of Iron Mountain Madrid Campus MAD-1 (Iron Mountain), a 3 MW data centre in San Fernando de Henares, Spain: mapped location, grid context…

    MW

    3

    Substations <25 km

    —

    Renewables <25 km

    —

    Renewable MW nearby

    —

    Could your asset host a data centre?

    Indicative grid, energy and competition screening. Two queries per account; not a grid connection study.

    San Fernando de Henares, Spain
    Assess my asset

    Published MW and IT load have different scopes. A nearby substation confirms neither connection nor available capacity; check status and figures against their sources.

    Technical data

    Published capacity

    3 MW

    Year

    Not published

    Operator

    Iron Mountain

    Grid connection

    No mapped substation within 25 km

    BtMData grid mapping

    Fibre latency (physical estimate)

    ~1.1 ms RTT → Madrid (14 km)

    Computed: geodesic distance / 200 km·ms⁻¹

    Current ambient temperature

    …

    Live weather measurement

    Latency is a physical lower-bound estimate, not a real network measurement.

    Connectivity: network and transport

    Nearby infrastructure from OpenStreetMap, queried live.

    Loading…

    Data centre record

    Operator / developerIron Mountain
    Published capacity3 MW
    CitySan Fernando de Henares
    CountrySpain
    Address—
    Coordinates40.42485, -3.53504
    Year—
    StatusOperational
    PhaseMAD-1 commissioning year not confirmed. Roadmap forecasts MAD-2 and MAD-3 in 2027 and development through 2030; forecasts, not confirmed openings.
    Expected year—
    IT load—
    Capacity noteIron Mountain states 3 MW current MAD-1 capacity; text does not unambiguously label its IT versus supply basis. 79 MW is planned campus development, not operational MAD-1 capacity. Page has no visible publication date; reviewed 2026-10-25.
    PUE—
    Energy type—
    Renewable energy—
    Energy noteApproximate location at the city centre; exact coordinates not published.
    Certifications—
    Certification note—
    Record last reviewed25/10/2026

    We only publish verifiable data. Anything the operator does not publish shows as “—”; it is never estimated.