Merlin Edged Madrid-Getafe
Verified profile of Merlin Edged Madrid-Getafe (Merlin Edged), a 20 MW data centre in Getafe, Spain: mapped location, grid context and nearby renewables.
MW
20
Substations <25 km
—
Renewables <25 km
—
Renewable MW nearby
—
Could your asset host a data centre?
Indicative grid, energy and competition screening. Two queries per account; not a grid connection study.
Published MW and IT load have different scopes. A nearby substation confirms neither connection nor available capacity; check status and figures against their sources.
Technical data
Published capacity
20 MW
Year
Not published
Operator
Merlin Edged
Grid connection
No mapped substation within 25 km
BtMData grid mapping
Fibre latency (physical estimate)
~1.1 ms RTT → Madrid (12 km)
Computed: geodesic distance / 200 km·ms⁻¹
Current ambient temperature
…
Live weather measurement
Latency is a physical lower-bound estimate, not a real network measurement.
Connectivity: network and transport
Nearby infrastructure from OpenStreetMap, queried live.
Loading…
Data centre record
| Operator / developer | Merlin Edged |
|---|---|
| Published capacity | 20 MW |
| City | Getafe |
| Country | Spain |
| Address | — |
| Coordinates | 40.31080, -3.69290 |
| Year | — |
| Status | Operational |
| Phase | The operator page states open. Commissioning year is unconfirmed; the 9 June 2023 announcement described construction, not opening: https://es.edged.es/news/edged-madrid-getafe-is-rising |
| Expected year | — |
| IT load | — |
| Capacity note | 20 MW critical load capacity declared by Edged for Madrid-Getafe 1; not utility supply or a measurement of operating IT load. Page has no visible publication date; reviewed 25 October 2026. |
| PUE | — |
| Energy type | — |
| Renewable energy | — |
| Energy note | — |
| Certifications | — |
| Certification note | — |
| Record last reviewed | 25/10/2026 |
We only publish verifiable data. Anything the operator does not publish shows as “—”; it is never estimated.