    Navalmoral de la Mata

    Merlin Edged Navalmoral de la Mata

    Verified profile of Merlin Edged Navalmoral de la Mata (Merlin Edged), a data centre in Navalmoral de la Mata, Spain: mapped location, grid context and…

    MW

    —

    Substations <25 km

    —

    Renewables <25 km

    —

    Renewable MW nearby

    —

    Could your asset host a data centre?

    Indicative grid, energy and competition screening. Two queries per account; not a grid connection study.

    Navalmoral de la Mata, Spain
    Assess my asset

    Published MW and IT load have different scopes. A nearby substation confirms neither connection nor available capacity; check status and figures against their sources.

    Technical data

    Published capacity

    Not published

    Year

    Not published

    Operator

    Merlin Edged

    Grid connection

    No mapped substation within 25 km

    BtMData grid mapping

    Fibre latency (physical estimate)

    ~2.7 ms RTT → Madrid (167 km)

    Computed: geodesic distance / 200 km·ms⁻¹

    Current ambient temperature

    …

    Live weather measurement

    Latency is a physical lower-bound estimate, not a real network measurement.

    Connectivity: network and transport

    Nearby infrastructure from OpenStreetMap, queried live.

    Loading…

    Data centre record

    Operator / developerMerlin Edged
    Published capacity—
    CityNavalmoral de la Mata
    CountrySpain
    Address—
    Coordinates39.89155, -5.54072
    Year—
    StatusAnnounced
    PhaseDevelopment protocols announced 2025-01-14. Planned connection to Arañuelo 400 kV and a ready-to-build description do not establish an operating facility. Actual start, delivery and opening year unconfirmed. Coordinates not verified in this 2026-10-25 review.
    Expected year—
    IT load—
    Capacity noteReviewed 2026-10-25. MERLIN Properties (2025-01-14) announces approximately 1 GW IT per campus and, for Navalmoral, 8–10 planned buildings of 100 MW IT each (800–1,000 MW IT development). Not operating capacity, authorized supply or energized load. Two same-named markers exist; exact identity/location await reconciliation. Planned capacity is recorded only in this note and is not added to both markers.
    PUE—
    Energy type—
    Renewable energy—
    Energy noteApproximate location at the city centre; exact coordinates not published.
    Certifications—
    Certification note—
    Record last reviewed25/10/2026

    We only publish verifiable data. Anything the operator does not publish shows as “—”; it is never estimated.