BtMData β€” EnergΓ­a y compliance para centros de datos
    Algete

    Microsoft MAD01

    Verified profile of Microsoft MAD01 (Microsoft), a data centre in Algete, Spain since 2024: mapped location, grid context and nearby renewables.

    MW

    β€”

    Substations <25 km

    β€”

    Renewables <25 km

    β€”

    Renewable MW nearby

    β€”

    Could your asset host a data centre?

    Indicative grid, energy and competition screening. Two queries per account; not a grid connection study.

    Algete, Spain
    Assess my asset

    Published MW and IT load have different scopes. A nearby substation confirms neither connection nor available capacity; check status and figures against their sources.

    Technical data

    Published capacity

    Not published

    Year

    2024

    Operator

    Microsoft

    Grid connection

    No mapped substation within 25 km

    BtMData grid mapping

    Fibre latency (physical estimate)

    ~1.2 ms RTT β†’ Madrid (24 km)

    Computed: geodesic distance / 200 km·ms⁻¹

    Current ambient temperature

    …

    Live weather measurement

    Latency is a physical lower-bound estimate, not a real network measurement.

    Connectivity: network and transport

    Nearby infrastructure from OpenStreetMap, queried live.

    Loading…

    Data centre record

    Operator / developerMicrosoft
    Published capacityβ€”
    CityAlgete
    CountrySpain
    Addressβ€”
    Coordinates40.59326, -3.54977
    Year2024
    StatusOperational
    Phaseβ€”
    Expected yearβ€”
    IT loadβ€”
    Capacity noteβ€”
    PUEβ€”
    Energy typeβ€”
    Renewable energyβ€”
    Energy noteβ€”
    Certificationsβ€”
    Certification noteβ€”
    Record last reviewed25/10/2026

    We only publish verifiable data. Anything the operator does not publish shows as β€œβ€”β€; it is never estimated.

    Links for Microsoft MAD01

    No source link is recorded for this site.Open in maps
    Assess an asset with GridPass