    Microsoft - Spain Central AZ Meco Meco

    Verified profile of Microsoft - Spain Central AZ Meco Meco (Microsoft – Spain Central AZ Meco), a data centre in Meco, Spain since 2024: mapped location…

    MW

    —

    Substations <25 km

    —

    Renewables <25 km

    —

    Renewable MW nearby

    —

    Could your asset host a data centre?

    Indicative grid, energy and competition screening. Two queries per account; not a grid connection study.

    Meco, Spain
    Assess my asset

    Published MW and IT load have different scopes. A nearby substation confirms neither connection nor available capacity; check status and figures against their sources.

    Technical data

    Published capacity

    Not published

    Year

    2024

    Operator

    Microsoft – Spain Central AZ Meco

    Grid connection

    No mapped substation within 25 km

    BtMData grid mapping

    Fibre latency (physical estimate)

    ~1.4 ms RTT → Madrid (35 km)

    Computed: geodesic distance / 200 km·ms⁻¹

    Current ambient temperature

    …

    Live weather measurement

    Latency is a physical lower-bound estimate, not a real network measurement.

    Connectivity: network and transport

    Nearby infrastructure from OpenStreetMap, queried live.

    Loading…

    Data centre record

    Operator / developerMicrosoft – Spain Central AZ Meco
    Published capacity—
    CityMeco
    CountrySpain
    Address—
    Coordinates40.53643, -3.31527
    Year2024
    StatusOperational
    Phase—
    Expected year—
    IT load—
    Capacity note—
    PUE—
    Energy type—
    Renewable energy—
    Energy note—
    Certifications—
    Certification note—
    Record last reviewed25/10/2026

    We only publish verifiable data. Anything the operator does not publish shows as “—”; it is never estimated.

    Links for Microsoft - Spain Central AZ Meco Meco

    No source link is recorded for this site.Open in maps
    Assess an asset with GridPass