    Verified profile of Pure DC MAD01 (Pure DC), a 70 MW data centre in Meco, Spain: mapped location, grid context and nearby renewables.

    MW

    70

    Substations <25 km

    —

    Renewables <25 km

    —

    Renewable MW nearby

    —

    Could your asset host a data centre?

    Indicative grid, energy and competition screening. Two queries per account; not a grid connection study.

    Meco, Spain
    Assess my asset

    Published MW and IT load have different scopes. A nearby substation confirms neither connection nor available capacity; check status and figures against their sources.

    Technical data

    Published capacity

    70 MW

    Year

    Not published

    Operator

    Pure DC

    Grid connection

    No mapped substation within 25 km

    BtMData grid mapping

    Fibre latency (physical estimate)

    ~1.4 ms RTT → Madrid (35 km)

    Computed: geodesic distance / 200 km·ms⁻¹

    Current ambient temperature

    …

    Live weather measurement

    Latency is a physical lower-bound estimate, not a real network measurement.

    Connectivity: network and transport

    Nearby infrastructure from OpenStreetMap, queried live.

    Loading…

    Data centre record

    Operator / developerPure DC
    Published capacity70 MW
    CityMeco
    CountrySpain
    Address—
    Coordinates40.55375, -3.32816
    Year—
    StatusUnder construction
    Phase—
    Expected year—
    IT load—
    Capacity note70 MW total (30 MW phase 1 under construction): Pure DC website, checked 2026-10-15.
    PUE—
    Energy type—
    Renewable energy—
    Energy note—
    Certifications—
    Certification note—
    Record last reviewed15/10/2026

    We only publish verifiable data. Anything the operator does not publish shows as “—”; it is never estimated.

    Links for Pure DC MAD01

    No source link is recorded for this site.Open in maps
    Assess an asset with GridPass