BtMData — Energía y compliance para centros de datos
    Alcover

    Scranton Enterprises Iberdata

    Verified profile of Scranton Enterprises Iberdata (Scranton Enterprises), a 20 MW data centre in Alcover, Spain: mapped location, grid context and nearby…

    MW

    20

    Substations <25 km

    —

    Renewables <25 km

    —

    Renewable MW nearby

    —

    Could your asset host a data centre?

    Indicative grid, energy and competition screening. Two queries per account; not a grid connection study.

    Alcover, Spain
    Assess my asset

    Published MW and IT load have different scopes. A nearby substation confirms neither connection nor available capacity; check status and figures against their sources.

    Technical data

    Published capacity

    20 MW

    Year

    Not published

    Operator

    Scranton Enterprises

    Grid connection

    No mapped substation within 25 km

    BtMData grid mapping

    Fibre latency (physical estimate)

    ~5.2 ms RTT → Madrid (421 km)

    Computed: geodesic distance / 200 km·ms⁻¹

    Current ambient temperature

    …

    Live weather measurement

    Latency is a physical lower-bound estimate, not a real network measurement.

    Connectivity: network and transport

    Nearby infrastructure from OpenStreetMap, queried live.

    Loading…

    Data centre record

    Operator / developerScranton Enterprises
    Published capacity20 MW
    CityAlcover
    CountrySpain
    Address—
    Coordinates41.26292, 1.17028
    Year—
    StatusAnnounced
    Phase—
    Expected year—
    IT load—
    Capacity notePower not verified against a primary source.
    PUE—
    Energy type—
    Renewable energy—
    Energy note—
    Certifications—
    Certification note—
    Record last reviewed—

    We only publish verifiable data. Anything the operator does not publish shows as “—”; it is never estimated.

    Links for Scranton Enterprises Iberdata

    No source link is recorded for this site.Open in maps
    Assess an asset with GridPass