Scranton Enterprises Iberdata
Verified profile of Scranton Enterprises Iberdata (Scranton Enterprises), a 20 MW data centre in Alcover, Spain: mapped location, grid context and nearby…
MW
20
Substations <25 km
—
Renewables <25 km
—
Renewable MW nearby
—
Could your asset host a data centre?
Indicative grid, energy and competition screening. Two queries per account; not a grid connection study.
Published MW and IT load have different scopes. A nearby substation confirms neither connection nor available capacity; check status and figures against their sources.
Technical data
Published capacity
20 MW
Year
Not published
Operator
Scranton Enterprises
Grid connection
No mapped substation within 25 km
BtMData grid mapping
Fibre latency (physical estimate)
~5.2 ms RTT → Madrid (421 km)
Computed: geodesic distance / 200 km·ms⁻¹
Current ambient temperature
…
Live weather measurement
Latency is a physical lower-bound estimate, not a real network measurement.
Connectivity: network and transport
Nearby infrastructure from OpenStreetMap, queried live.
Loading…
Data centre record
| Operator / developer | Scranton Enterprises |
|---|---|
| Published capacity | 20 MW |
| City | Alcover |
| Country | Spain |
| Address | — |
| Coordinates | 41.26292, 1.17028 |
| Year | — |
| Status | Announced |
| Phase | — |
| Expected year | — |
| IT load | — |
| Capacity note | Power not verified against a primary source. |
| PUE | — |
| Energy type | — |
| Renewable energy | — |
| Energy note | — |
| Certifications | — |
| Certification note | — |
| Record last reviewed | — |
We only publish verifiable data. Anything the operator does not publish shows as “—”; it is never estimated.
