    Stoneshield / XDC - Proyecto Altamira Altamira

    Verified profile of Stoneshield / XDC - Proyecto Altamira Altamira (Stoneshield / XDC – Proyecto Altamira), a data centre in Piélagos / Villaescusa, Spain…

    MW

    —

    Substations <25 km

    —

    Renewables <25 km

    —

    Renewable MW nearby

    —

    Could your asset host a data centre?

    Indicative grid, energy and competition screening. Two queries per account; not a grid connection study.

    Piélagos / Villaescusa, Spain
    Assess my asset

    Published MW and IT load have different scopes. A nearby substation confirms neither connection nor available capacity; check status and figures against their sources.

    Technical data

    Published capacity

    Not published

    Year

    Not published

    Operator

    Stoneshield / XDC – Proyecto Altamira

    Grid connection

    No mapped substation within 25 km

    BtMData grid mapping

    Fibre latency (physical estimate)

    ~4.4 ms RTT → Madrid (339 km)

    Computed: geodesic distance / 200 km·ms⁻¹

    Current ambient temperature

    …

    Live weather measurement

    Latency is a physical lower-bound estimate, not a real network measurement.

    Connectivity: network and transport

    Nearby infrastructure from OpenStreetMap, queried live.

    Loading…

    Data centre record

    Operator / developerStoneshield / XDC – Proyecto Altamira
    Published capacity—
    CityPiélagos / Villaescusa
    CountrySpain
    Address—
    Coordinates43.46000, -3.81000
    Year—
    StatusAnnounced
    PhaseProject officially announced 2025-02-25; announcement is not commissioning or energized capacity. Opening year and delivery schedule unconfirmed in the official source reviewed. Reviewed 2026-10-25.
    Expected year—
    IT load—
    Capacity noteReviewed 2026-10-25. The Government of Cantabria (2025-02-25) confirms a planned technology campus in Piélagos and Villaescusa, developed in three phases, but the official source located does not substantiate MW or IT/supply scope. Removed 500 MW from the headline figure: not confirmed in the official source reviewed. Operating capacity unconfirmed.
    PUE—
    Energy type—
    Renewable energy—
    Energy note—
    Certifications—
    Certification note—
    Record last reviewed25/10/2026

    We only publish verifiable data. Anything the operator does not publish shows as “—”; it is never estimated.