    Templus CEU01

    Verified profile of Templus CEU01 (Templus), a 1 MW data centre in Ceuta, Spain: mapped location, grid context and nearby renewables.

    MW

    1

    Substations <25 km

    —

    Renewables <25 km

    —

    Renewable MW nearby

    —

    Could your asset host a data centre?

    Indicative grid, energy and competition screening. Two queries per account; not a grid connection study.

    Ceuta, Spain
    Assess my asset

    Published MW and IT load have different scopes. A nearby substation confirms neither connection nor available capacity; check status and figures against their sources.

    Technical data

    Published capacity

    1 MW

    Year

    Not published

    Operator

    Templus

    Grid connection

    No mapped substation within 25 km

    BtMData grid mapping

    Fibre latency (physical estimate)

    ~6.2 ms RTT → Madrid (523 km)

    Computed: geodesic distance / 200 km·ms⁻¹

    Current ambient temperature

    …

    Live weather measurement

    Latency is a physical lower-bound estimate, not a real network measurement.

    Connectivity: network and transport

    Nearby infrastructure from OpenStreetMap, queried live.

    Loading…

    Data centre record

    Operator / developerTemplus
    Published capacity1 MW
    CityCeuta
    CountrySpain
    Address—
    Coordinates35.89442, -5.35582
    Year—
    StatusOperational
    Phase—
    Expected year—
    IT load—
    Capacity notePower not verified against a primary source.
    PUE—
    Energy type—
    Renewable energy—
    Energy note—
    Certifications—
    Certification note—
    Record last reviewed—

    We only publish verifiable data. Anything the operator does not publish shows as “—”; it is never estimated.