    Villanueva de Gállego

    Vantage Data Centers Villanueva de Gállego

    Verified profile of Vantage Data Centers Villanueva de Gállego (Vantage Data Centers), a data centre in Villanueva de Gállego, Spain: mapped location, grid…

    MW

    —

    Substations <25 km

    —

    Renewables <25 km

    —

    Renewable MW nearby

    —

    Could your asset host a data centre?

    Indicative grid, energy and competition screening. Two queries per account; not a grid connection study.

    Villanueva de Gállego, Spain
    Assess my asset

    Published MW and IT load have different scopes. A nearby substation confirms neither connection nor available capacity; check status and figures against their sources.

    Technical data

    Published capacity

    Not published

    Year

    Not published

    Operator

    Vantage Data Centers

    Grid connection

    No mapped substation within 25 km

    BtMData grid mapping

    Fibre latency (physical estimate)

    ~3.8 ms RTT → Madrid (283 km)

    Computed: geodesic distance / 200 km·ms⁻¹

    Current ambient temperature

    …

    Live weather measurement

    Latency is a physical lower-bound estimate, not a real network measurement.

    Connectivity: network and transport

    Nearby infrastructure from OpenStreetMap, queried live.

    Loading…

    Data centre record

    Operator / developerVantage Data Centers
    Published capacity—
    CityVillanueva de Gállego
    CountrySpain
    Address—
    Coordinates41.78603, -0.85652
    Year—
    StatusAnnounced
    PhaseAnnouncement recorded in a secondary source; existence, construction status and opening not confirmed by an official source located. Marker retained without merging records or validating coordinates. Reviewed 2026-10-25.
    Expected year—
    IT load—
    Capacity noteReviewed 2026-10-25. Removed 300 MW with no primary support located. The official directory reviewed https://vantage-dc.com/data-center-locations/emea/ does not confirm this Spanish campus or its capacity. Exact project identity, IT/supply capacity and operating capacity unconfirmed. No capacity is assigned to this marker or the other Zaragoza record.
    PUE—
    Energy type—
    Renewable energy—
    Energy note—
    Certifications—
    Certification note—
    Record last reviewed25/10/2026

    We only publish verifiable data. Anything the operator does not publish shows as “—”; it is never estimated.

    Links for Vantage Data Centers Villanueva de Gállego

    No source link is recorded for this site.Open in maps