BtMData β€” EnergΓ­a y compliance para centros de datos
    Reinach

    NorthC data centers Basel

    Verified profile of NorthC data centers Basel, a data centre in Reinach, Switzerland: mapped location, grid context and nearby renewables.

    MW

    β€”

    Substations <25 km

    β€”

    Renewables <25 km

    β€”

    Renewable MW nearby

    β€”

    Could your asset host a data centre?

    Indicative grid, energy and competition screening. Two queries per account; not a grid connection study.

    Reinach, Switzerland
    Assess my asset

    Published MW and IT load have different scopes. A nearby substation confirms neither connection nor available capacity; check status and figures against their sources.

    Technical data

    Published capacity

    Not published

    Year

    Not published

    Operator

    Not published

    Grid connection

    No mapped substation within 25 km

    BtMData grid mapping

    Fibre latency (physical estimate)

    ~3.6 ms RTT β†’ Milan (258 km)

    Computed: geodesic distance / 200 km·ms⁻¹

    Current ambient temperature

    …

    Live weather measurement

    Latency is a physical lower-bound estimate, not a real network measurement.

    Connectivity: network and transport

    Nearby infrastructure from OpenStreetMap, queried live.

    Loading…

    Data centre record

    Operator / developerβ€”
    Published capacityβ€”
    CityReinach
    CountrySwitzerland
    Addressβ€”
    Coordinates47.51252, 7.61549
    Yearβ€”
    StatusOperational
    Phaseβ€”
    Expected yearβ€”
    IT loadβ€”
    Capacity noteCapacity and commissioning year unverified with a reliable original source (reviewed 2026-10-16). Third-party directory and crowd-sourced values are excluded; campus values are not allocated to buildings.
    PUEβ€”
    Energy typeβ€”
    Renewable energyβ€”
    Energy noteβ€”
    Certificationsβ€”
    Certification noteβ€”
    Record last reviewed16/10/2026

    We only publish verifiable data. Anything the operator does not publish shows as β€œβ€”β€; it is never estimated.

    Links for NorthC data centers Basel

    Assess an asset with GridPass