Equinix LD10
Verified profile of Equinix LD10 (Equinix), a data centre in Slough, United Kingdom since 2015: mapped location, grid context and nearby renewables.
MW
β
Substations <25 km
β
Renewables <25 km
β
Renewable MW nearby
β
Could your asset host a data centre?
Indicative grid, energy and competition screening. Two queries per account; not a grid connection study.
Published MW and IT load have different scopes. A nearby substation confirms neither connection nor available capacity; check status and figures against their sources.
Technical data
Published capacity
Not published
Year
2015
Operator
Equinix
Grid connection
No mapped substation within 25 km
BtMData grid mapping
Fibre latency (physical estimate)
~1.3 ms RTT β London (34 km)
Computed: geodesic distance / 200 kmΒ·msβ»ΒΉ
Current ambient temperature
β¦
Live weather measurement
Latency is a physical lower-bound estimate, not a real network measurement.
Connectivity: network and transport
Nearby infrastructure from OpenStreetMap, queried live.
Loadingβ¦
Data centre record
| Operator / developer | Equinix |
|---|---|
| Published capacity | β |
| City | Slough |
| Country | United Kingdom |
| Address | Liverpool Road 13, SL1 4QZ |
| Coordinates | 51.52225, -0.62459 |
| Year | 2015 |
| Status | Operational |
| Phase | β |
| Expected year | β |
| IT load | β |
| Capacity note | Year: Equinix release dated 2017-02-06 states the former IO UK facility opened for business in 2015. Capacity: not verified for this map record. Original source: https://investor.equinix.com/news-events/press-releases/detail/315/equinix-acquires-io-uks-data-center-business. Checked: 2026-10-16. |
| PUE | β |
| Energy type | β |
| Renewable energy | β |
| Energy note | β |
| Certifications | β |
| Certification note | β |
| Record last reviewed | 16/10/2026 |
We only publish verifiable data. Anything the operator does not publish shows as βββ; it is never estimated.