BtMData — Energía y compliance para centros de datos
    Paiania

    Data4 Athens · Paiania campus

    Data Center in Paiania

    Data4 Athens · Paiania campus is a data center record in Paiania, Greece, operated by Data4. Explore its location, recorded status, alongside nearby substations and generation to compare the site's energy surroundings.

    MW

    —

    Substations <25 km

    —

    Renewables <25 km

    —

    Renewable MW nearby

    —

    Sample site report for Zaragoza, Spain

    Site report · €690

    Substations, high-voltage lines and generation within 25–50 km, with indicative CapEx and country regulations.

    Sample: Zaragoza, Spain · Your report is generated for your chosen location.

    Could your asset host a data centre?

    Public map and sources. Site Advisor: two free queries with an account and contact details; indicative screening, not connection confirmation.

    Paiania, Greece
    Assess my asset
    I prefer to talk to BtMData

    Published MW and IT load have different scopes. A nearby substation confirms neither connection nor available capacity; check status and figures against their sources.

    Technical data

    Published capacity

    Not published

    Year

    2026

    Operator

    Data4

    Grid connection

    No mapped substation within 25 km

    BtMData grid mapping

    Fibre latency (physical estimate)

    ~15.7 ms RTT → Milan (1475 km)

    Computed: geodesic distance / 200 km·ms⁻¹

    Current ambient temperature

    …

    Live weather measurement

    Latency is a physical lower-bound estimate, not a real network measurement.

    Connectivity: network and transport

    Nearby infrastructure from OpenStreetMap, queried live.

    Loading…

    Data centre record

    Operator / developerData4
    Published capacity—
    CityPaiania
    CountryGreece
    AddressAgiou Louka 33, 190 02 Paiania, Greece
    Coordinates37.94290, 23.87357
    Year2026
    StatusOperational
    PhasePartially operational campus: DC01 first phase July 2026 according to Data4. HIIF acquires 23%; DC01 expansion targeted for 2027. Does not imply the entire campus is operational.
    Expected year—
    IT load—
    Capacity noteData4 18 November 2026, reviewed 21 November 2026: up to 90 MW IT planned across two data centres; 15 MW for full DC01, whose first phase has operated since July 2026 and second phase targets 2027. Current operating IT capacity unpublished: MW field empty so campus target is not counted as operational. Address and marker coordinates from official campus website, reviewed 21 November 2026.
    PUE—
    Energy type—
    Renewable energy—
    Energy note—
    Certifications—
    Certification note—
    Record last reviewed21/11/2026

    We only publish verifiable data. Anything the operator does not publish shows as “—”; it is never estimated.

    Links for Data4 Athens · Paiania campus

    Want to know whether this site works? Start with the site report.