    Europe Data Center Map

    3,208 sites across 35 countries, high-voltage substations, renewable plants and the projects-seeking-connection layer: every value with its own page and source. The same base layer we use to assess whether an industrial asset can host compute.

    Sites

    3,208

    Countries

    35

    Operators

    —

    Published MW

    11,458

    With source

    —

    Site report in minutes

    Enter an address or coordinates and download a PDF with substations, high-voltage lines and generation within 25–50 km, plus indicative CapEx and country regulation. €690, secure payment with Stripe.

    Several sites a month? Monthly plans below.

    AI site advisor

    Is a data centre viable here?

    Type a location and the power you need: you get a viability score from 0 to 100 with its sources.

    Site Advisor

    El Site Advisor es exclusivo para usuarios registrados. Crea una cuenta gratuita o inicia sesión para analizar una ubicación (2 consultas gratis).

    Latest announcements and milestones

    Sources reviewed ·

    · Latvia

    Northern · Salaspils

    >200 MW planned

    Exclusive rights over 16 ha. Early-stage project: proposed 110 and 330 kV connection phases; firm capacity and opening unconfirmed. Exact location pending: not yet mapped.

    · Greece

    Data4 · Atenas / Athens

    Up to 90 MW campus IT

    HIIF acquires 23%. DC01 first phase operational since July 2026; 15 MW for full DC01, second phase targeted for 2027. The 90 MW figure is the campus target, not operating capacity.

    · United Kingdom

    Drax · Brookfield · Radiant

    Up to 100 MW · phase 1

    Partnership to develop the Drax site. Phase 1 targets Q1 2028; ambition of 500 MW cumulative by 2031. Subject to permits and agreements: not an operating data centre.

    · Spain

    IREN · Badajoz

    ~300 MW planned

    Former Nostrum Evergreen project. IREN announces a civil works licence and initial operations targeted for 2028; not equivalent to full construction approval or 300 MW of operating IT load.

    European comparison

    Compare countries: grid, congestion and stock

    Grid congestion, connection queue years, substations, renewables and installed stock, sortable country by country.

    View comparison

    European pipeline

    Data centres in development

    Announced, permitted and under-construction projects with published capacity, phase and a verifiable source — compared against the operating base by country.

    View pipeline

    Data centres by country

    Proprietary database of sites, grid and renewables, verified and maintained by BtMData. Only published capacity is shown: unpublished values are never estimated.

    Do you own an industrial or energy asset?

    We turn assets into viable data centre projects: energy and compliance with GridPass.